Back Filled Walls Paraseal installation/seams running vertically Paraseal installation/seams running horizontally Paraseal installation/close clearance at masonry wall Tie-in between below floor Paraseal and wall Paraseal Tie-in between wall Paraseal and horizontal deck Paraseal Tie-in Paraseal to other existing waterproofing Typical grade line termination Typical grade line termination Typical pipe penetration detail Typical outside corner Typical inside corner Below Slab On Grade Simple slap-system A Mat slab-system B Mat slab with protective slab-system C Mat slab with mud slab-system D Simple slab-system A Mat slab-system B Mat slab with protective slab-system C Mat slab with mud slab-system D Tie-in between backfilled wall/footing and floor slab Tie-in between backfilled wall/footing and mat slab/protection slab Tie-in between backfilled wall and mat slab/protection slab Tie-in between backfilled wall and mat slab/mud slab Tie-in between blindside wall/footing and floor Tie-in between blindside wall and mat slab/protection slab Tie-in between blindside wall and below floor waterproofing Termination at floor to interior wall face. HDPE side down Termination at floor to interior wall face. HDPE side up Floor to wall expansion joint Mid floor expansion joint Thru floor penetration (cast-in-place) Thru floor penetration (cast-in-place) Thru floor penetration (blocked out and plugged) Thru floor penetration Concrete pile with pile cap Concrete pile with mat slab Footing at interior column Typical fold detail at beow to wall inside corner Blindside construction of elevator, sump, or other below floor pit Blindside Walls Paraseal LG installation over wood lagging with steel piles Paraseal LG installation over steel sheet piling Paraseal LG installation over augered caisson Paraseal LG installation over shotcrete with concrete piles Paraseal LG installation over a slurry wall Paraseal LG installation over chemically stabilised earth Interrupting Paraseal LG at vertical soldier piles - plan view Installing Paraseal LG directly over steel soldier pile - plan view Installing Paraseal LG over lagging board gaps - plan view Paraseal LG installation over a slurry wall Paraseal LG installation at studs or form tiles Paraseal LG installation at tie-back Paraseal LG installation at tie-back blockout method Paraseal LG installation at horizontal blindside to backfilled transition Closing off the top of infill material between lagging and wall Typical temporary termination at top of earth retaining system Paraseal LG installation at wall penetration Blindside walls. Termination above grade Below grade waterproofing. Termination at grade line Paraseal LG installation at concrete pilaster - plan view Expansion join - plan view Paraseal LG installation at blindside to backfilled transition - plan view Paraseal LG installation at wall to below floor tie-in (see Section C) Proper installation of shotcrete against Paraseal LG Termination at top of deck Paraseal LG installation at jon in lagging walls - plan view New wall to existing wall tie-in - plan view Proper anchoring of Paraseal seams